# How do you connect HotSchedules to your payroll system?

> The durable way to connect HotSchedules to your payroll system is through a top layer rather than a point-to-point link. Both plug in underneath VorenX, their records are matched to the same people and locations, every sync is checked by the third clock, and approved changes are written back to each system of record. Schedules and punches from HotSchedules are matched to the same employees and stores as payroll, hours are approved once in VorenX, and approved hours are written to the payroll system of record.

Source: https://vorenx.com/answers/connect-hotschedules-to-payroll/

## Why it is hard today

A direct HotSchedules link to your payroll system breaks when either vendor changes, and it only moves data; nobody sees where the two disagree.

Each new system then needs another point-to-point link, and people still work in several apps.

## How to do it

1. **Plug both in underneath.** Through each system's API, reports, files or webhooks.
2. **Match records.** Same people, locations and periods, by id.
3. **Check every sync.** Differences go to the owner of the record.
4. **Write back.** Approved changes go to each system of record.

## How VorenX does it

VorenX connects HotSchedules this way, alongside every other system you run, and every role sees the result in one screen.

- [HotSchedules + VorenX](https://vorenx.com/integrations/hotschedules/)
- [How two-way integration works](https://vorenx.com/platform/two-way-integration/)

## Questions people ask

### How do you connect HotSchedules to your payroll system?

The durable way to connect HotSchedules to your payroll system is through a top layer rather than a point-to-point link. Both plug in underneath VorenX, their records are matched to the same people and locations, every sync is checked by the third clock, and approved changes are written back to each system of record. Schedules and punches from HotSchedules are matched to the same employees and stores as payroll, hours are approved once in VorenX, and approved hours are written to the payroll system of record.

### Do we have to stop using HotSchedules?

No. HotSchedules stays the system of record underneath VorenX.
